TRINGEN 1 AMMONIA FACILITY

METHANATOR REPLACEMENT

Summary of Project Scope:

  • Summary of Scope: – Changeout Methanator R2111 (65T) Reactor
    – Remove all associated piping and structural.
    – Develop all lifting studies, including all lift plans, ensure certified rigging tools and tackles.
    – All welding was done in accordance with ASME Sect IX
    – Manage all Sub-contractors inclusive of bolt torque, NDE, Insulation
    – Quality Dossier handover
  • Commendations from Yara International for Safely Conducting four heavy lift on a single day which include three tandem and one vertical

Safety: Project was executed with Zero Accidents or Incidents.

Quality: All works were carried out the accordance with the Owners work instructions.