PERENCO SOLAR PANEL
SOLAR PANEL TRANSPORT FOR SHIPPING
Summary of Scope:
- Design lifting aids as well as point load location for installation
- Procure all lifting tools and tackles for project which includes but not limited to slings, shackles, turn buckles…etc.
![](https://asequith.com/wp-content/uploads/2021/04/6-4.jpg)
![](https://asequith.com/wp-content/uploads/2021/02/OFFSHORE-2-1.jpg)
Safety and Commendations
- Safety: Project completed with Zero Incident, Accident or First Aid cases.